CSE Building / EBU3B > Campus Meter
Name: EBU3B Main Building Power Sub Station A

Description: Main power sub station (Sub Station A) for the EBU3B building. Sub Station A is the major power line going into the building.
kW-Hours: 0 kW-H
Average kW: 0 kW
Energy costs: $0
Start Date:
End Date: