Main Campus Meters > Campus Meter
Name: Campus Total Power Imports

Description: Total power imports from SDGE. The shortfall between the total power generation and total power consumption is how much the UCSD campus must import from SDGE.
kW-Hours: 0 kW-H
Average kW: 0 kW
Energy costs: $0
Start Date:
End Date: